Vidext v0.15.77 is out: See who spends your tokens, a tidier Settings, and more. Read the release notes →
Skip to Content
Vidext Docs

Deliver in your LMS (LTI 1.3)

Connect your LMS so teachers can add Vidext modules to their courses and progress flows back to the gradebook.

Use this page if your company already delivers training through a learning management system (LMS) such as Moodle or Canvas, and you want learners to take Vidext modules there instead of in Vidext.

You don't have to choose between the two. Vidext is an LTI 1.3 tool, the standard way LMSs plug in outside content: your LMS opens Vidext modules in place, learners don't sign up for Vidext or log in a second time, and their completion and score go back to the LMS.

Connections are set up by organization admins in Integrations, in Home's sidebar. Members see the learning platforms there, and which ones are connected, but can't connect or change one.

Connect an LMS

Integrations shows the connections you already have under Connected, and the LMSs you can add under Learning platforms: SAP SuccessFactors Learning, Workday Learning, Cornerstone, Docebo, Moodle, Canvas, D2L Brightspace, Blackboard, ILIAS, and Another LTI 1.3 LMS. Workday Learning and SAP SuccessFactors Learning connect without LTI (see Workday Learning and SAP SuccessFactors Learning). Select your LMS's card, then Connect; an LMS you already use stays there, so you can connect a second campus of it. For an LMS with dynamic registration, Connect opens a menu with the two ways below. Each LMS uses the names its own setup screens use.

A connection's chip shows its state:

  • In process: the registration link is out and Vidext is waiting for your LMS.
  • Setup unfinished: the connection has no active installation, usually because the LMS registered Vidext without an installation ID. Select its card and paste your LMS's Deployment ID.
  • Connected: an installation is active. The page says No launches yet until someone opens Vidext from the LMS.
  • Connected, with Paused on its Launches row: launches from this LMS are turned off.

Installations and what they can open

Select a connection under Connected in Integrations to open it. Each place your LMS installs Vidext is an installation, identified by its Installation ID (Deployment ID) and listed under Installations, where Add installation adds another. For each installation you choose:

  • Content to share: the teams whose content it can open, picked from a searchable list. All teams selects every team you have today; a team you create later has to be added. The installation can open the live modules (the versions learners get) of the published courses assigned to those teams. A module stops opening as soon as it stops being live: its course unpublished, or the module withdrawn. See Publish a course.
  • Let teachers choose a Vidext module: lets course builders in the LMS pick a live module (Select a Vidext module, then Add to LMS) and save it as an activity. How to use Vidext in a course, on the connection's page, shows teachers' steps for your LMS.
  • Allow access from this installation: pause access without deleting the installation.

On the connection itself, Pause launches in More options stops new launches without deleting anything (learners see a message until you resume), and Delete connection there permanently removes it with its installations, usage history, and the module links teachers saved. Setup URLs keeps Vidext's URLs at hand for your LMS, and on connections set up by hand Connection details lets you correct the issuer, client ID, or endpoints without starting over.

Without content selection (Deep Linking)

Some LMSs support LTI 1.3 launches and grades (AGS) but not Deep Linking, the content selection behind Select a Vidext module. Vidext works with them too: instead of picking the module from a list, you name it in each activity.

  1. Open the module in Vidext and copy its ID, the last part of its address, after /module/. The module has to be live in a published course assigned to one of the installation's teams, as in Content to share above.
  2. In your LMS, add an LTI activity that uses the Vidext tool and give it the custom parameter vidext_module_id= followed by the module ID. Docebo can't send custom parameters, so on a Docebo connection you end the activity's Tool URL with it instead: https://app.vidext.com/api/lti/launch?vidext_module_id= followed by the module ID (see Docebo).
  3. To get completion and grades back, make the activity a graded item, so it has its own column in the gradebook.

The first launch of an activity saves its module, and Check your connection counts it as a saved selection. You can turn off Let teachers choose a Vidext module for that installation; it then reads Fixed content.

What the LMS must send

For whoever configures Vidext in the LMS, or the LMS vendor:

  • Login initiation with iss, login_hint, target_link_uri, client_id, and lti_deployment_id. LTI 1.3 makes the last two optional; Vidext needs both to find the connection and the installation.
  • A target_link_uri on https://app.vidext.com, normally the Tool URL, https://app.vidext.com/api/lti/launch. Use https://app.vidext.com for every Vidext URL in your LMS, even if you open Vidext at another address.
  • A resource link launch (LtiResourceLinkRequest) with vidext_module_id in its custom claim (from Docebo, in the query of its target_link_uri).
  • For grades, the AGS endpoint claim with the activity's lineitem and the https://purl.imsglobal.org/spec/lti-ags/scope/score scope, and a token endpoint that grants that scope. The line item has to be an HTTPS address on the host of the connection's issuer or of one of its endpoints, or a subdomain of it. Vidext never creates line items; it only posts to the one the launch names. For a refused grade to be sent again, the launch also needs the https://purl.imsglobal.org/spec/lti-ags/scope/result.readonly scope, which lets Vidext read the grade the LMS already holds (see Progress and grades reach your gradebook).
  • Name and email are optional. Without an email, the learner's Vidext account gets a placeholder address.

Limits

  • No picker. Whoever builds the LMS course needs each module's ID, and the LMS has no list of Vidext modules to choose from.
  • One module per activity, fixed at first launch. Editing the parameter afterwards doesn't change what the activity opens; add a new activity instead.
  • Grades need a graded activity. Without a line item the module still opens and learners' progress is kept in Vidext, but neither completion nor grade reaches the gradebook. When the launch names a line item Vidext can't post to, the installation's grade status says why.

Docebo

Docebo supports basic LTI 1.3 launches and scores, but not Deep Linking, custom parameters, or Dynamic Registration. Each Vidext module is its own LTI 1.3 training material in Docebo, with the module's ID at the end of its Tool URL:

  1. In Vidext, select the Docebo card, then Connect. Add Vidext in Docebo lists Vidext's URLs under Docebo's names, with the Tool URL (iss) ending in vidext_module_id=.
  2. In Docebo, go to Training materials, click New, choose LTI and then version 1.3, and name it after the module. Paste the URLs, adding the module's ID to the end of the Tool URL.
  3. Docebo shows its values under Content > Platform fields. Paste them into Paste details: Platform ID is the issuer, Authentication request URL the authorization endpoint, Access token URL the token endpoint, and Docebo's keyset URL the JWKS endpoint. Then add its Deployment ID as the installation.
  4. For each further module, add another training material the same way. If Docebo shows the same Client ID, add its Deployment ID under Installations on this connection; if not, connect it as another Docebo connection.
  5. Under Properties, share the launcher's name and email, and choose when Docebo marks the material complete. For a module with questions, choose completion after a score: Vidext sends the number of questions answered correctly, and Docebo doesn't rescale LTI 1.3 scores, so the minimum passing score counts correct answers. A module without questions sends no score, so have Docebo mark it complete when it opens.
  6. Assign the material to courses from its Assigned courses tab.

If your Docebo uses a custom domain or Extended Enterprise, use that address in the values you paste into Vidext. Docebo needs a separate training material for each domain it serves.

Check the connection

Usage history starts with Check your connection, the steps that confirm it works, ticked off as they happen: add an installation, open Vidext from an LMS course, choose content from the LMS, then open the saved item. Below it, Recent launches lists the latest five (who opened which module, from which installation), followed by how many module selections teachers have saved. Together they make first-setup debugging fast.

When a launch fails, the LMS shows a Vidext page that says what went wrong in one line and gives numbered steps for whoever set up the connection. When the problem is the connection or the installation, Details for support shows the issuer, client ID and deployment ID your LMS sent, to compare with the connection in Vidext. A learner who lands there is asked to send the page to their teacher.

Progress and grades reach your gradebook

Vidext reports back over AGS (Assignment and Grade Services, part of LTI 1.3), so a Vidext activity behaves like any graded item in the LMS course:

  • Completion — the activity reads as in progress while the learner works through the module, and complete once they finish it.
  • A quiz grade — sent once the module is complete, computed from the version the learner opened. The first answer to each question is the one that counts, so a second pass can't inflate the grade.
  • Active time — sent with the completion as the grade's comment: the minutes the learner spent active in the module, in the language their LMS opened the activity in when it is one of Vidext's languages (English, Spanish, Italian, Polish or German), and in English otherwise. Moodle shows it as the grade's feedback. It counts the time until the completion is sent; time spent in the module after that isn't sent.

When your LMS refuses a grade or doesn't answer, Vidext sends it again on its own, less and less often, for up to a week, as long as your LMS lets Vidext read the grades it holds. Before each new try, Vidext reads the learner's grade in the LMS:

  • No grade yet: Vidext sends its own.
  • The same grade: it already arrived, so it counts as sent.
  • A different grade, for example one a teacher typed in: Vidext leaves it as it is and doesn't try that grade again, not even when the learner opens the activity again.
  • An answer Vidext can't rely on: the LMS refuses the read, or answers with other learners' grades or with more pages. Vidext sends nothing and reads again at the next try.

Reading grades is the AGS permission to read results (result.readonly). Vidext asks for it when your LMS registers it through a registration link, but the LMS can still leave it out. For a connection set up by hand, or one registered before Vidext asked for it, turn on the permission to read results, or submission data, in your LMS's settings for the Vidext tool, next to the permission to send scores. The LMS grants it to each launch as it starts, so it only helps launches made after you turn it on. Without it, a refused grade is not sent again on its own, and the installation's grade status says so; it goes out again only when the learner opens the activity again.

A grade is not sent again either for a module that has since been archived or withdrawn, or when Vidext can't tell which version of the module the learner's launch used. Grades sent while the learner is working through the module go out right away, without reading the LMS first.

Some refusals repeat until something changes in the LMS: HTTP 400, 404, 410 or 422, for example when the LMS doesn't grade that person in the course or the activity's gradebook column was deleted. Moodle only grades people enrolled in the course as students, so it refuses a site administrator's grade every time. After one of these, Vidext doesn't send that grade again as the learner keeps working in the same launch. The retries above still run, and the learner's next launch can send it again.

Each installation under Installations shows its grade status: when the last grade was sent, or when the last one failed and why.

What learners see

Learners click the activity in their LMS and the module opens with its narration, subtitles, and quizzes. There is no link back to the LMS inside the module; learners return with their LMS's own navigation. See What a module looks like.

Their first launch makes them a learner of your organization, with the name and email your LMS shares. Data handling and deletion lists what a launch stores and what deleting a connection leaves.

Workday Learning

Workday Learning has no LTI, so Vidext connects to it in another way: see Deliver through Workday Learning.

SAP SuccessFactors Learning

SAP SuccessFactors Learning has no LTI either, so Vidext connects to it as an Open Content Network provider: see Deliver through SAP SuccessFactors Learning. Vidext turns this connection on with each customer, so talk to us to start.

On this page